Motorway Koper – Lendava, section Beltinci – Pince, subsection Lendava – Pince
Assignment name:
Motorway Koper – Lendava, section Beltinci – Pince, subsection Lendava – Pince
Country:
Slovenia
Location within country:
Pomurje – E region
Name of client:
DARS – Motorway company in the republic of the Slovenia, Ulica XIV. divizije SI-3000 Celje
Firm’s Name:
BPI Ltd., Mlinska ulica 32, SI-2000 Maribor, Slovenija, EU
Lineal Ltd., Jezdarska ulica 3, SI-2000 Maribor, Slovenija, EU
Completion date:
August 2008
Approximate value of the contract:
2.332.208,61 €
Total number of staff – months of the assignment:
App. 190 men/month
Number of professional staff – months provided by associated Consultants:
Nil
Narrative description of the project:
A Detailed Plan of National Importance was prepared for MW section Lendava – Pince in July 2004 providing instructions and limitations for Main Design documentation and later actual construction. The project was divided into 3 stages, from which the stages B and C were designed by BPI Ltd.
Stage B:
The route of MW Lendava – Pince starts at km 0+000 and follows the existing Lendava bypass route until it reaches km 1+500, where it crosses the Ledava river and another smaller stream in “S” curve. It completely bypasses historical site of Gabo Kert from km 4+300 to km 4+700 as it turns towards Dolnji Lakoš. It then crossed the railroad Lendava – Čakovec and over the northern part of the old spa area bypasses Nafta Lendava oil plant. The route then turns North and misses the Zatek village for about 120 m before connecting with Hungarian route over Dolinski pašniki area at International border crossing Pince.
Stage C:
This stage represents the Expressway route, that starts at International Border Crossing Dolga vas and joins the existing Lendava Bypass in km 1+000. It then turns North, following the existing road to km 2+000 where it turns South and bypasses Dolga vas at its furthest western end. At km 3+000, the existing Bypass crosses the Kobiljski potok stream and connects to the Motorway in thr “Dolga vas” junction.
Motorway section Lendava – Pince technical data
Motorway route, normal cross-section 21,20 m, length 13,671 km
Motorway junction Lendava and Pince, overall length of branches is 1,581 km and interchange Dolga vas
Build of highway in length of 2,800 km
Junction of highway and interchange Dolga vas
Plateau for supply center from km 13+000 to km 13+300
Dewatering and purification of rainfall waste water, traffic signs and equipment
15 deviations of categorized roads in overall length of 7,144 km
23 deviations of field-access roads in overall length of 10,860 km
1 viaduct in length of 183,40 m
2 underpasses in overall length of 115,92 m
12 overpasses in overall length of 1374,8 m
15 bridges in overall length of 381,31 m
11 rectangular road culverts in overall length of 389,62 m
6 livestock and wildlife passes in overall length of 73,70 m
Noise barriers in overall length of 847 m
Regulation and structures for water protection, arrangement of communal installations
Description of actual services provided by your staff within the assignment:
The engineering, consultant and design services comprise of:
Project management.
Main Design, Detailed Design, Tender Design and Completed works design:
4.55 km of Motorway
3,0 km of Expressway
2 Out of level intersection with roundabouts
5 909 m of Deviations of categorized roads
5 427 m of Deviations of un-categorized roads
Traffic equipment design and specs. (5 961 m)
Structures design (bridges, under and over passes, retaining walls, etc.)
Water management project
Other infrastructure design coordination and consulting
Noise barrier design coordination and consulting
Setting out